The Illinois Department of Transportation says inspection work on the U.S. 30 Gateway Bridge over the Mississippi River in Whiteside County will begin Monday, Nov. 16, weather permitting.

The work consists of inspecting the structure. IDOT says there will be daily lane closures from 8 a.m. to 3 p.m., with one lane of traffic controlled by flaggers.

The work is expected to be completed by 3 p.m. Wednesday, Nov. 18.