Transportation officials from Illinois and Missouri cut the ribbon on the new Interstate 270 Chain of Rocks twin bridges over the Mississippi River in Madison County, the Illinois Department of Transportation announced.
The Illinois and Missouri departments of transportation were joined by local leaders and industry partners for the ribbon-cutting. The agency said the bridges are the centerpiece of a combined $531.6 million investment to improve safety and mobility while creating jobs and economic opportunity along what IDOT called a critical freight and travel corridor.
The new westbound span is set to open Nov. 16, according to IDOT.
The agency said the project is the latest achievement made possible by Gov. JB Pritzker's Rebuild Illinois capital program, which it said is delivering billions of dollars in major projects across the state this fall.
Background
The crossing, often called the I-270 bridge, replaces the earlier New Chain of Rocks Bridge that opened in 1966 on the north edge of the St. Louis area, according to Wikipedia. The project calls for twin spans carrying I-270 over the Mississippi River between Missouri and Illinois.
IDOT and MODOT have described the work as a joint effort to provide two lanes in each direction, expandable to three, with wider shoulders to help first responders reach crashes. Roughly 51,000 vehicles travel the crossing each day, about 20% of them trucks, according to an earlier account of the project's 2023 groundbreaking published by the Illinois Business Journal.
Source: the original release

